The view up the driveway. Trees trimmed, retaining wall on left replaced... way better |
Closer-up view. New roof, windows, stucco and the Stairs painted... |
Left side of house. New retaining wall to keep the hillside mud off the house... and its working! |
The back of the house cleaned up; bridge built and grill on line! |
The backyard- terraces built! |
The top 2 terraces will be the veggie garden... |
The view from the other end of the garden- 2 x 7' x 50' long- 700 sq. ft. to grow in! |
The deck; this pix from the top terrace in the garden... |
This view from the right side of the house- hot tub is completely functional! |
New water heater and HVAC system. We ended up repiping the house (new copper and gas service); and redoing all the duct work. |
The first time i saw it, the
garage was full of crap! Its full of stuff again... but now its our stuff! good news is- its a 3 car garage. |
Jordan's room... done. (and now she has a real bed and blinds!) |
Taylor's sanctuary today... (now she has blinds, too!) |
Master Bedroom. done. move in. |
Fireplace in MBR |
Vanity with corian top |
and...tada... my shower! its awesome! |
The girls' bathroom- done! |
The Laundry room is fully on-line. It still needs better lighting! |
The Family Room. Way better! |
Another view of the Family Room. The fireplace got extended and we stucco'ed the whole thing; and now it has a mantle! |
The dining room now...he worked GREAT for Thanksgiving dinner! |
New hanging fixtures (way better than the bare-bulb-on-a-chain look); handrails refinished. |
The kitchen now- legs done, most lights installed, almost finished! |
Guest bath done; open for business. |
The office... |
...and the view in the morning. excellent! |