We finally did it- we broke down and ordered a big plasma (one of these. Now we have a problem- the rack has to disappear for the kitchen project. We decided to relocated the rack over to the pool bathroom. HERE we've carved a 3" hole in the face of the fireplace and inserted a 2" conduit. |
Carving the fireplace was tres dusty, so George put up this temp screen that contained 97% of the mess. |
This is roughly the hole we had when we got done. |
Next step was to sheetrock over the conduit and plaster it all- here it is after the first coat. |
The conduit runs from the Family Room to the master closet- only way there is over the pool! Here's MJ demonstrating how we get access to work on it ;-) |